Projects & portfolio

Operating scale, with the definitions attached.

The headline portfolio and active O&M contract base measure different things. This page keeps them separate, labelled and reconcilable.

Illustrative utility-scale hybrid renewable-energy infrastructure in western India
Illustrative infrastructure · published portfolio measures remain separately defined
Gujarat operations55

strategic locations in Gujarat

Per the TEV report. Map nodes are indicative only; exact site coordinates, capacity and technology are not published. Geometry source: SVG Maps of India, CC BY 4.0.
Portfolio by numbers

Three measures. Three explicit bases.

8.2
GW total portfoliooperational + contracted, KP Group
2.2
GW operationalassets under active O&M today
1,733
MW under active O&M contractAssets under active O&M contract, by segment and technology (MW).
Active O&M contract mix

Segment and technology.

Assets under active O&M contract, by segment and technology (MW).

Hybrid-SolarHybrid-WindSolarWind
CPP (captive)1,077 MW
45223358450
IPP657 MW
964148337
Representative projects

Project-level publication record.

Verified project list required

Capacity, technology, district, scope and year have not been approved for six to eight representative projects. No placeholder projects or disguised client claims are shown.

Approved client names

Typeset names, pending logo-rights confirmation.

GUVNLCoal India LimitedSJVNAditya Birla Renewable EnergyApraava EnergyAyana RenewablesTorrent PowerDGVCLTata GroupL&T GroupAether IndustriesAnupam RasayanGreen Lab DiamondsMono Steel IndiaVD GlobalGACLINGEL

{{TODO: CONFIRM logo usage rights per client before publishing marks.}}

Case studies

Outcome evidence belongs here.

Measured case studies required

No named before/after result has been cleared for publication. The section remains visibly incomplete instead of converting broad portfolio claims into invented outcomes.

Next step

Assess the fit against your portfolio.

Share the asset mix, location, operating model and current performance record. We will structure the conversation around comparable operating conditions.