KPI Green OMS · A KP Group company

We run renewable plants like instruments, not installations.

Full-scope O&M for solar, wind and hybrid assets — monitored from an AI-assisted NOC built on IBM Maximo, and cleaned by robots we design and build ourselves.

2.2
GW operationalassets under active O&M today
8.2
GW total portfoliooperational + contracted, KP Group
70
sites under management
880
robots deployed in the field

Line of business 01

Operations & Maintenance

You own the asset. We own the uptime. Preventive, predictive and corrective maintenance across solar, wind and hybrid plants, with NOC-level monitoring, statutory compliance and DSM-aware forecasting handled end to end.

  • 1,733 MW under active O&M
  • 160+ CPP and 40+ IPP clients
  • 24×7 NOC coverage
See the full O&M scope

Line of business 02

Solar Cleaning Robotics

We design, engineer and manufacture waterless cleaning robots in Gujarat. Three platforms, three deployment economics — buy, lease, or take cleaning as a service. 880 units are in the field today.

  • 2,400 solar panels / hour (SR4000)
  • Zero water consumption
  • ~70% lower cost than manual cleaning
Compare the three platforms
Why O&M is an engineering problem

A plant loses money in ways nobody sees from the boardroom.

Soiling, string-level drift, inverter derating and slow fault response do not announce themselves. The gap between a plant that is running and a plant that is performing is measured in single-digit percentages — and on a 500 MW asset, those are not a rounding error.

Performance ratio
Maintained baselineUnaddressed loss
Operating period →Illustrative — not client data
SoilingString deviationInverter deratingFault response time
Scope

Eighteen line items. All of them ours.

Most contracts fragment maintenance, diagnostics, compliance and billing across three vendors. Every row below sits inside one contract and one accountable team.

Preventive

  • Preventive & scheduled maintenance
  • Corrective / breakdown maintenance
  • Module cleaning (robotic and manual)
  • HV & LV system maintenance
  • Vegetation abatement
  • Spares & warranty management

Accountability · KPI Green OMS

Diagnostics

  • Drone thermography
  • Electroluminescence (EL) imaging
  • I-V curve tracing
  • Soiling analysis
  • Plant health checks

Accountability · KPI Green OMS

Commercial & regulatory

  • Monitoring, forecasting & reporting
  • Billing & collections support
  • Insurance administration
  • DISCOM / regulator interface
  • Compliance & audit documentation
  • Right-of-Way and legal affairs support

Accountability · KPI Green OMS

Response

  • 24/7 customer support desk

Accountability · KPI Green OMS

Full scope schedule PDF · pending verified publication file

The instrument layer

Every asset, every inverter, every anomaly — one screen.

Our Network Operations Centre runs on IBM Maximo Renewables, integrated with plant SCADA and layered with UDA, our in-house unified data platform. The UDA AI Agent handles breakdown analysis, anomaly detection, performance-deviation flags and automated reporting.

Third-party recognition

The NOC's asset management backbone. IBM published a global case study recognising KP Group's NOC as a benchmark for digital operations in renewable energy.

Case study link pending verification
Inside the NOC
Illustrative renewable-energy Network Operations Centre with operators reviewing a portfolio video wall
Illustrative NOC environment · operational data shown conceptually
NOC / Unified operationsSystem view · illustrative
  1. Plant SCADA
  2. CMS
  3. IBM Maximo
  4. UDA — Unified Data Access
  5. UDA AI Agent
  6. Dashboards · Reports · Tickets

Data path · system architecture

Plant availability %
Performance Ratio (PR)PR
Specific yield (kWh/kWp)kWh/kWp
CUF / PLF %PLF
Grid availability %
Inverter uptime %
String-level deviationΔ
Soiling loss %%
Built in Gujarat, engineered for export

Three cleaning platforms. Three different plant problems.

Illustrative waterless solar-panel cleaning robot travelling across a utility-scale PV array
Illustrative field deployment · final configuration is engineered to plant geometry
Illustrative SR4000 waterless cleaning platform spanning a utility-scale solar array
Semi-automated · 4 m span

SR4000

A wide, shared platform for fixed-tilt arrays where row-to-row flexibility matters.

4 mSpan width
2,400Panels cleaned / hour
  • Shareable across multiple rows for cost efficiency
  • Adjustable up to 100 mm for misaligned panels
  • Swappable battery for continuous operation
Illustrative SR2000 dedicated cleaning robot operating along a long solar-array row
Fully automatic · 2 m span

SR2000

A fully automated, dedicated platform engineered around long-row autonomy and central control.

2 mSpan width
3 km per chargeRange per charge
  • Dedicated per-row deployment, zero row movement
  • Central monitoring with one-click, schedule-based cleaning
  • One of the longest single-charge runs in its category
Illustrative SR-Shuttle Link transferring a cleaning robot between adjacent solar rows
Mobile docking system

SR-Shuttle Link

A mobile, self-charging transfer system for adjacent arrays with changing height and tilt.

5–6 rows per unitRows per unit
700–800 mTrack length
  • Adjustable height (±250 mm) and tilt (25°–30°)
  • Self-charging power dock for continuous operation
  • Precision alignment when moving between rows

We manufacture these ourselves — 2,010 sq. m at Kural, 25+ R&D engineers, and a further 2,000 sq. m fabrication unit planned for 2027.

Full specifications
Track record

Thirty years of infrastructure behind a three-year-old company.

KPI Green OMS was incorporated in 2022. The operating discipline behind it is KP Group's, built since 1994 across 2,200 CKM of transmission lines and 70 substations.

Illustrative hybrid renewable-energy site combining solar, wind, battery storage and grid infrastructure
Illustrative hybrid infrastructure · portfolio claims remain defined by the published fact registry
Gujarat operations55

strategic locations in Gujarat

Per the TEV report. Map nodes are indicative only; exact site coordinates, capacity and technology are not published. Geometry source: SVG Maps of India, CC BY 4.0.
GUVNL
Coal India Limited
SJVN
Aditya Birla Renewable Energy
Apraava Energy
Ayana Renewables
Torrent Power
DGVCL
Tata Group
L&T Group
Aether Industries
Anupam Rasayan
Green Lab Diamonds
Mono Steel India
VD Global
GACL
CPP / captive1,077 MW
IPP657 MW

Assets under active O&M contract, by segment and technology (MW).

Next step

Send us a plant. We'll tell you what it's losing.

Share capacity, location and the last twelve months of generation data. You get a written assessment, not a sales call.